| 71 |
Environmental Impact Assessment (EIA) for the project titled “3D Seismic Survey over Lamigaon, Lalabazar, Dowarabazar South and Rashidpur South”.
SGFL/EIA/3DSEISMIC/LP2
|
Sylhet Gas Fields Limited (SGFL) |
11/05/2026 |
15/06/2026
12:00 hrs (BST)
|
Sylhet |
| 72 |
Selection of Individual Consultant: Wing Manager (Quality Assurance Specialist) Package No. S-36B2) (Tender ID 1271498)
HEAT/PMU/215/2026-2448 (36B2)
|
Project Director, Higher Education Acceleration and Transformation (HEAT) Project |
09/05/2026 |
25/05/2026
03:00 PM
|
Dhaka |
| 73 |
Selection of Individual Consultant: Wing Manager: Faculty Professional Development Specialist (Package No: 36D2)
HEAT/PMU/215/2026-2448
|
Asaduzzaman |
08/05/2026 |
25/05/2026
03:00 PM
|
Dhaka |
| 74 |
Consulting Firm for Preparation of National Water Resources Plan (NWRP)
42.02.0000.000.005.14.0010.26/NWRP/S-01
|
Project Director, Preparation of National Water Resources Plan (NWRP) |
07/05/2026 |
24/05/2026
16:00 pm
|
Dhaka |
| 75 |
Independent Engineer (International Consultancy Firm) for the Establishment and Operation of Laldia Container Terminal at Chittagong Port through PPP model .
02/Executive Engineer/Harbour/2025-2026
|
Chairman, Chittagong Port Authority represented by Chief engineer, Chittagong Port Authority |
06/05/2026 |
07/06/2026
12:00 hours
|
Chattogram |
| 76 |
Request for Expression of Interest (REOI) for “Procurement of Design, Management and Supervision Consultant Services (DMS Consultant)” for the project: “Urban Climate Resilient Infrastructure Project (UCRIP)”
46.02.0000.578.16.006.26-65 & EOI Ref-No: BMZ No.: 2018 6774.6
|
Project Director |
05/05/2026 |
08/06/2026
12.00 pm noon UTC
|
Dhaka |
| 77 |
Selection of Consultant Firm for Hydrogeological Investigation and Mathematical Modeling in South-West Hydrological Region of Bangladesh.
42.02.0000.000.004.14.0006.25/ReTender/SWHR/SD2
|
Project Director, SWHR Project |
05/05/2026 |
20/05/2026
16:00
|
Dhaka |
| 78 |
Gender & Social Consultant
22.02.0000.065.14.005.26.141
|
Project Director, Community-based management of Tanguar Haor Wetland Ecosystem Project |
05/05/2026 |
20/05/2026
12.00PM
|
Dhaka |
| 79 |
Monitoring & Evaluation Consultant
22.02.0000.065.14.006.26.142
|
Project Director, Community-based management of Tanguar Haor Wetland Ecosystem Project |
05/05/2026 |
20/05/2026
12.00PM
|
Dhaka |
| 80 |
Installation of new Transmission Pipeline along with Distribution Networks in DMA 5, 6 & 7 under DMZ 3, Induced Bank Filtration (IBF) Wellfield, Collector Pipeline and Shitalakkhya River Crossing Transmission Pipeline with O&M
46.16.0000.009.99.028.2025-26/25
|
Project Director (In-charge) |
04/05/2026 |
11/06/2026
2.00 PM
|
Narayanganj |