| 161 |
Periodic Maintenance Providing DBSWC work at Ch. 0+000 (Rajnagar Point) to 1+570, Ch. 2+270 to 19+000 & Ch. 48+300 to 57+500 (Chand Grame) Including partial Strengthening work, Saucer Drain, Sign-Signal & km Post etc of Rajnagar-Kulaura-Juri-Baralekha-Beanibazar-Sheola-Charkhai (R-281) Road under Road Division, Moulvibazar during the year 2026-2027.
ACE Memo No: 35.01.6000.010.000.07.0001.26-2585
|
Executive Engineer, RHD, Road Division, Moulvibazar. |
11/08/2026 |
08/09/2026
01:30 PM
|
Moulvibazar |
| 162 |
Periodic Maintenance Providing DBSWC Including partial Strengthening and Re-construction work at Ch.0+000 (Juri Night Chowmuhona) to Ch. 2+030, Ch. 4+600 to Ch. 16+720 (Lathitila), Sign-Signal & km posts etc Juri-Lathitila Road (R-282) under Road Division, Moulvibazar during the year 2026-2027.
ACE Memo No: 35.01.6000.010.000.07.0001.26-2584
|
Executive Engineer, RHD, Road Division, Moulvibazar. |
11/08/2026 |
08/09/2026
01:30 PM
|
Moulvibazar |
| 163 |
Surfacing work by DBS Wearing Course, Repair & Maintenanec work including Rutt Correction work, Strenghtening by Base Type-I, Construction of Rigid Pavement and installation of different kind of sign signal under Periodic Maintenance Program (PMP-Road) at Ch: 0+000 (Fouzderhat) to Ch: 11+682 (Chattogram Port Newmuring Gate) Km of Chattogram Port Access Road (N-111) under Chattogram Road Division during the year 2026-2027.
e-GP/PMP Road/02/EE/CRD/RHD/2026-2027 (ID-1320695)
|
Executive Engineer, RHD, Chattogram Road Division. |
20/08/2026 |
14/09/2026
12:00 PM
|
Chattogram |
| 164 |
Widening of Road Embankment by Earth work, Widening (2x1.60m) of Existing Pavement, Road Surfacing by DBS (9.30m width), RCC Drain, Protective work, Sign-Signal, Km post, Road Marking work from Chainage 22+000 (Godown Ghat) to 28+350 (Mariamnagar) of Chattogram (Mohora)-Chandragona Regional Highway (R-163) under Chattogram Road Division during the year 2026-2027.
e-GP/PMP Road/03/EE/CRD/RHD/2026-2027 (ID-1320697)
|
Executive Engineer, RHD, Chattogram Road Division. |
20/08/2026 |
14/09/2026
12:00 PM
|
Chattogram |
| 165 |
Construction of Internal Road at Sylhet Mohila Polytechnic Institute, Dakshin Surma, Sylhet.
EED/Desk-5/912
|
Office of the Executive Engineer, Education Engineering Department, Sylhet |
10/06/2026 |
03/09/2026
12:00 PM
|
Sylhet |
| 166 |
Re-Construction of Boundary wall and fencing with sub-station-11 at East Residential Area.
18.13.0000.000.327.07.0006.25
|
Executive Engineer (Construction)/Chittagong Port Authority |
19/08/2026 |
10/09/2026
11:30 AM
|
Chattogram |
| 167 |
Re-Construction of Boundary wall and fencing with sub-station-10 at Road no. 07 in North Residential Area.
18.13.0000.000.327.07.0005.25
|
Executive Engineer (Construction)/Chittagong Port Authority |
19/08/2026 |
10/09/2026
03:00 PM
|
Chattogram |
| 168 |
Periodic Mantenence work by Aggregate Base Type I, DBS Base Course, DBS Wearing Course, RCC U-Drain, RCC Toe Wall With Slope Protection at Ch. 0+000 Km to Ch. 3+600 Km (Jogodishpur Muktijodda Chattor-to taliapara bazar), Ch. 4+000 Km to Ch. 20+000 Km (Taliapara bazar to Chanpur) and Construction of Rigid Pavement from Ch. 3+600 Km to Ch. 4+000 Km (taliapara bazar) of Jagodishpur-Chunarughat-Shsistaganj (N-204) Road under Road Division, Habiganj, during the year 2026-2027.
35.01.3600.429.07.249.25-1428
|
Habiganj Road Division |
18/08/2026 |
17/09/2026
01:00 PM
|
Habiganj |
| 169 |
Periodic Mantenence work by Aggregate Base Type I, DBS Base Course, DBS Wearing Course, RCC U-Drain at Ch. 20+000 Km to Ch. 25+160 Km (Chanpur Bazar to Chunarughat Bazar), Ch. 25+455 Km to Ch. 31+950 Km (Chunarughat Bazar to Durghapur Bazar), Ch. 32+135 Km to Ch. 34+000 Km (Durgha Pur Bazar to Shaistaganj) & Ch. 34+240 Km to Ch. 34+421 Km (Shaistaganj), and Construction of Rigid Pavement from Ch. 25+160 Km to 25+455 Km (Chunarughat bazar), Ch. 31+950 Km to Ch. 32+135 Km (Durgahpur bazar) Ch. 34+000 Km to Ch. 34+240 Km (Shaistaganj) of Jagodishpur-Chunarughat-Shsistaganj (N-204) Road under Road Division, Habiganj, during the year 2026-2027.
35.01.3600.429.07.249.25-1428
|
Habiganj Road Division |
18/08/2026 |
10/09/2026
01:00 PM
|
Habiganj |
| 170 |
Periodic Mantenence work by Providing DBS Base Course, DBS Wearing Course, RCC Palisiding, RCC U-Drain at Ch. 00+737 Km (Mirpur Bazar) to Ch. 12+000 Km (Muchai Bazer) & Construction of Rigid Pavement at Ch. 00+000 Km to Ch. 00+457 Km (Titarkona to Mirpur bazar), of Mirpur-Sreemongal-Moulvibazar-Sherpur Road (N-207) Road under Road Division, Habiganj, during the year 2026-2027.
35.01.3600.429.07.249.25-1428
|
Habiganj Road Division |
18/08/2026 |
10/09/2026
02:00 PM
|
Habiganj |