| 191 |
Curve Widening & Straightening work for Accident-Prone Curve at Different KM of Chattogram-Hathazari-Rangamati National Highway (N-106) Under Rangamati Road Division during the financial year 2026-2027.
e-Gp/PMP Road/RRD-01/2026-2027
|
Rangamati Road Division |
16/08/2026 |
15/09/2026
01:00 PM
|
Rangamati |
| 192 |
Surfacing Work by DBS Wearing Course at Ch. 00.00 Km (Bogachari) to Ch. 12.000 Km (Naniyerchar) of Bogachari-Naniyarchar-longudu Road (Z-1612) under Rangamati Road Division during the financial year 2026-2027.
e-Gp/PMP Road/RRD-02/2026-2027
|
Rangamati Road Division |
16/08/2026 |
15/09/2026
01:00 PM
|
Rangamati |
| 193 |
Widening and Improvement of Rangamati(Manikchari)-Mohalchari-Khagrachari Regional Highway (R-162) to Proper Standard in Rangamati district from Ch. 24+000 to 33+500 and in Khagrachari district from Ch. 33+500 to 38+350.
RRD/DEV/RMK/WP/03
|
Rangamati Road Division |
16/08/2026 |
17/09/2026
12:30 PM
|
Rangamati |
| 194 |
Construction of BRTA Building at Diabari, Dhaka (Sub-Head:- External Electrification Works)
emdk8/APP/tender-209/2023-24
|
PWD E/M DIVISION-08 |
12/08/2026 |
27/08/2026
04:00 PM
|
Dhaka |
| 195 |
Providing Dense Bituminous Surfacing work (DBSW), Partial Protective work & Earth work under Periodic Maintenance Programme (PMP Major) from ch. 9+550 to 16+000 of Shariatpur (Burirhat)-Goshairhat (Z-8601) Road under Road Division, Shariatpur during the year-2026-2027.
e-GP-02/EE/SRD/PMP-Major/2026-2027.
|
Executive Engineer, RHD, Road Division, Shariatpur. |
12/08/2026 |
10/09/2026
01:00 PM
|
Shariatpur |
| 196 |
Providing Strengthening & Dense Bituminous Surfacing work (DBSW), Partial Protective work & Earth work under Periodic Maintenance Programme (PMP Major) from ch. 15+000 to 25+297 of Shariatpur-Gonganagor-Mongalmazirghat (Z-8065) Road under Road Division, Shariatpur during the year-2026-2027.
e-GP-01/EE/SRD/PMP-Major/ 2026-2027.
|
Executive Engineer, RHD, Shariatpur |
14/08/2026 |
10/09/2026
01:00 PM
|
Shariatpur |
| 197 |
Providing Strengthening & Dense Bituminous Surfacing work (DBSW), Partial Protective work & Earth work under Periodic Maintenance Programme (PMP Major) from ch. 0+000 to 3+600 of Kaneswar-Damudya (Z-8605) Road under Road Division, Shariatpur during the year-2026-2027.
e-GP-03/EE/SRD/PMP-Major/ 2026-2027
|
Executive Engineer, RHD, Shariatpur |
14/08/2026 |
10/09/2026
01:00 AM
|
Shariatpur |
| 198 |
Periodic Maintenance Programme (PMP-Major-Road) Providing Widening,Strengthening flexible Pavement, DBS Base Course, DBS Wearing Course, Protective work & Other ancillary works from Ch. 103+400 to 103+500 ,103+710 to 105+550 & 106+000 to 107+500 of Dhaka (Jatrabari)-Mawa-Bhanga-Barishal-Patukhali (N-8) National Highway Road under Road Division, Madaripur during the FY 2026-2027.
e-GP02/EE/ERD/PMP-Mejor/2026-2027
|
Executive Engineer, RHD Road Division Madaripur |
13/08/2026 |
07/09/2026
03:00 PM
|
Madaripur |
| 199 |
Periodic Maintenance Programme (PMP-Major-Road) Providing Widening,Strengthening flexible Pavement, DBS Base Course, DBS Wearing Course, Protective work & Other ancillary works from Ch. 107+500 (Pantapara) to 111+050 (Pthuriarpar) of Dhaka (Jatrabari)-Mawa-Bhanga-Barishal-Patukhali (N-8) National Highway Road under Road Division, Madaripur during the FY 2026-2027.
e-GP04/EE/ERD/PMP-Mejor/2026-2027
|
Executive Engineer, RHD Road Division Madaripur |
13/08/2026 |
07/09/2026
03:30 AM
|
Madaripur |
| 200 |
Recycling of Ashphalt Pavement and DBS Wearing Course Work from Ch:34+900m to 36+378m [Recycling Part 998.0m], Ch:37+178m to 39+500m, Ch:41+878m to 42+678m, Ch:44+828m to 45+378m and Ch:49+278m to 51+378m (total=6770m); Strengthening with Base Type-I, DBS Base Course & DBS Wearing Course Work from Ch:34+900m to 36+378m [Partial Strengthening Part 480.0m], Ch: 47+248m to 47+748m and Ch: 52+478m to Ch: 52+978m (total=1480m) and Partial Strengthening with Base Type-I, DBS Base Course (Partial Strengthening portion) & DBS Wearing Course work from Ch: 51+378 to 52+478m (total=1100m) of Khulna-Chuknagar-Satkhira (N-760) National Highway under PMP (Major-Road) [Road Division Satkhira] [FY:2026-2027].
e-GP/01/OTM/PMP-Major/Sat/RHD/2026-2027
|
Executive Engineer, Road Division, Satkhira |
|
10/09/2026
12:00 PM
|
Satkhira |