| 2151 |
Construction of 05(Five) RAB Complexes and One RAB forces Training School complex(2nd revised). Sub-Head: Gas connection for RAB 14 Barrack Complex at Mymensingh.
RDPP-RAB-Mymen-WD-23-e
|
Mymensingh PWD Division, Mymensingh |
21/11/2024 |
12/12/2024
01:00 PM
|
Mymensingh |
| 2152 |
Operation, Maintenance & Servicing of 06nos. Lift Installed at BCIC Bhaban.
36.01.2654.321.26.004.24.1273
|
BCIC |
11/11/2024 |
09/12/2024
11:30 AM
|
Dhaka |
| 2153 |
Construction of 3 nos. Söm length, 10 nos. 32m length & 10 nos. 20m length, Total 23 nos. culvert for Patuakhal EPZ Project (Package no. PEPZ W-08)
03.06.7895.325.14.93.24-411
|
Project Director, Patuakhali Export Processing Zone Project, BEPZA, Dhaka |
29/10/2024 |
10/12/2024
12:00 PM
|
Dhaka |
| 2154 |
58.02.0000.006.11.057.18 (part-4)-4153
|
Director general |
20/11/2024 |
15/12/2024
11:00 AM
|
Dhaka |
| 2155 |
Sand supply & filling in internal Roads and Plots with maintenance and supply of demarcation pillar at DOHS area in Jashore.
23.22.7005.007.50.005.24-1183
|
Cantonment Board, Jashore Cantonment, Jashore |
20/11/2024 |
05/12/2024
12:00 PM
|
Jashore |
| 2156 |
Turnkey contract for Survey, Design,Supply,Carrying Installation, Testing & Commissioning of 33 KV Double Circuit River Crossing Tower with Transmission Lines including Civil Construction works at Shiyalguni (DC Ghat) to Faridpur crossing point on Karkhana River in Barishal PBS-1.
27.12.0000.230.17.001.24.125
|
Project Director, " Modernization and Capacity Enhancement of BREB Network (Barisal Division)" Project |
17/11/2024 |
19/12/2024
10:00 AM
|
Dhaka |
| 2157 |
Turnkey contract for Survey, Design,Supply,Carrying Installation, Testing & Commissioning of 33 KV Double Circuit River Crossing Tower with Transmission Lines including Civil Construction works at Thogra to Charakhali crossing point on Balaswar River in Pirojpur PBS .
27.12.0000.230.17.001.24.125
|
Project Director, " Modernization and Capacity Enhancement of BREB Network (Barisal Division)" Project |
17/11/2024 |
19/12/2024
12:00 PM
|
Dhaka |
| 2158 |
27.12.0000.230.17.001.24.125
|
Project Director, " Modernization and Capacity Enhancement of BREB Network (Barisal Division)" Project |
17/11/2024 |
19/12/2024
12:00 PM
|
Dhaka |
| 2159 |
i) Upgrading of Khamar Bari RCC road starting from R&H road to College BC Road in ward no. 09 under Barguna Pourashava. Ch.00- 184.00m. ii) Part-(A) Repair & Maintenance of Amtala Bottala BC road Starting from Battala to Gobinda Malakar house via Sankor Shop & Link Amtala Sankor shop West side to Let Rasid Miah House in ward no -05 Under Barguna Pourashava (Ch. 0.00-304.00m & Link237.00= Total-541.00m). Part-(B) Construction of RCC Drain Starting from Amtala Hashe house to Porimol Sir house road side Drain via Fazlu & Ali Akbor Mohuri house & Billerbari RCC Drain Top Slab Starting from Amtala Sankor Shop West Side to Mitu Mahol House in Ward no-5 Under Barguna Pourashava (L-145m) & RCC Drain Top Slab L=114m).
46.00.0440.201.36.001.24-705
|
XEN, Barguna Paurashava |
18/11/2024 |
05/12/2024
01:00 PM
|
Barguna |
| 2160 |
i) Construction of RCC Drain Starting from House of DC Aslam RCC road Corner to Crock Khal & Side Extension of road in ward no-04, Under Barguna Paurashava, Barguna. (170.00m) ii) Upgrading of Shahi Mosque RCC Road Starting from Dhanshre RCC road to KG School BC Road in Ward no-04, Under Barguna Paurashava. iii) Construction of Shahi Mosque RCC Drain Starting from Dhanshre RCC road to KG School BC Road in Ward no-04, Under Barguna Paurashava.(Ch00-250.00m)
46.00.0440.201.36.001.24-705
|
XEN, Barguna Paurashava |
20/11/2024 |
05/12/2024
01:00 PM
|
Barguna |