| 7101 |
46.03.6800.061.07.001.19-213, Date-25/02/2020
|
Executive Engineer |
|
15/03/2020
12:00 PM
|
Narsingdi |
| 7102 |
46.03.6800.061.07.001.19-212, Date-25/02/2020
|
Executive Engineer |
|
15/03/2020
01:00 PM
|
Narsingdi |
| 7103 |
46.03.6800.061.07.001.19-211, Date-25/02/2020
|
Executive Engineer |
|
15/03/2020
12:00 PM
|
Narsingdi |
| 7104 |
TURNKEY CONTRACT FOR DESIGN, SUPPLY, CONSTRUCTION, INSTALLATION, TESTING & COMMISSIONING OF SWITCHING STATION FOR NAOGAON PBS-1AT 33kV SWITCHYARD OF NAOGAON 132/33KV GRID SUB-STATION UNDER BREB.
7.12.0000.162.27.001.20.1256
|
Project Director, Distribution Network Expansion for 100% Rural Electrification (Rajshahi, Rangpur, Khulna & Barisal Divisions), Bangladesh Rural Electrification Board, Dhaka. |
23/02/2020 |
25/03/2020
12:00 PM
|
Dhaka |
| 7105 |
Establishment of Colonel Malek Medical College & 500 Beded Hospital at Manikgonj ( Sub-head : Construction of vertical extension of hospital building from 5th floor over existing 4th floor civil, internal sanitary & water supply arrangement and internal electrical works), during the year-2019-2020.
Office of the ACE,Dhaka Zone. Memo-846 dt : 10-2-2020
|
Executive Engineer, PWD division, Manikganj. |
10/02/2020 |
25/03/2020
11:30 PM
|
Manikganj |
| 7106 |
Improvement of Damurhuda GC-Bhogirotpur GC Road (Ch. 00m-10900m) in Damurhuda Upazila. Dist. Chuadanga. (Road ID:218312005)
(Total Cost of Salvage Materials: Tk. 30,64,719.00)
Memo No: 46.02.0000.931.19.242.19.47
|
The PE is Local Government Engineering Department, represented by: Executive Engineer, District: Chuadanga |
14/01/2020 |
25/03/2020
03:30 PM
|
Chuadanga |
| 7107 |
Improvement of Alamdanga-Sorajgong G.C (Alamdanga Portion) at ch-00m-18000m in alamdanga Upazila. Dist. Chuadanga. (Road ID:218072002)
(Total Cost of Salvage Materials: Tk. 5147775.00)
Memo No: 46.02.0000.931.19.242.19.32
|
The PE is Local Government Engineering Department, represented by: Executive Engineer, District: Chuadanga |
09/01/2020 |
25/03/2020
03:30 PM
|
Chuadanga |
| 7108 |
Design, Supply, Installation and Testing-Commissioning of Computer Based Interlocked Signaling system at 7 (Seven) stations including interlocking of selected level crossings and installation of optical fiber cable based telecommunication system for block operation and CTC interface work (Turnkey Works) in connection with construction of 3rd and 4th Dual Gauge Track in Dhaka-Tongi section and Doubling of Dual Gauge Track in Tongi-Joydebpur section.
PD/DTJDLP/TENDER/WD2-831
|
Project Director, Name of Project: Construction of 3rd and 4th Dual Gauge Lines in Dhaka-Tongi section and Doubling of Dual Gauge line in Tongi-Joydebpur section including Signalling works |
20/02/2020 |
08/04/2020
12:00 PM
|
Dhaka |
| 7109 |
18.04.0000.426.07.094.19
|
Director_Electrical |
20/02/2020 |
19/03/2020
11:30 AM
|
Chattogram |
| 7110 |
18.04.0000.426.07.094.19
|
Director_Electrical |
|
19/03/2020
11:30 AM
|
Chattogram |