| 7171 |
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 33/11 KV SUB-STATIONS (10/14MVA EACH, Turn-Key)
27.12.0000.162.27.002.20.974 ;
|
“Distribution Network Expansion for 100% Rural Electrification (Rajshahi, Rangpur, Khulna & Barisal Divisions)” Project |
23/01/2020 |
01/03/2020
12:00 PM
|
Dhaka |
| 7172 |
18.04.0000.810.07.041.19
|
Deputy Chief Engineer (Marine), Chittagong Port Authority |
20/01/2020 |
17/02/2020
03:15 PM
|
Chattogram |
| 7173 |
BAPEX/Admin/INT/TEN-966/2020
|
General Manager, Geology Division, BAPEX |
23/01/2020 |
12/03/2020
11:00 AM
|
Bhola |
| 7174 |
Dredging of Bangali-Karotoa river from km-24.00 to km-123.00 total 99.00 km in Bogura District under the project Dredging /Re-excavation of Bangali-Karotoya-Fuljor-Hurasagor River System with Bank protection.
T-5/812
|
Exevutive Engineer, Bogura O&M Division, BWDB, Bogura. |
21/01/2020 |
12/03/2020
12:00 PM
|
Bogura |
| 7175 |
Dredging of Bangali-Karotoa river from km-24.00 to km-123.00 total 99.00 km in Bogura District under the project Dredging /Re-excavation of Bangali-Karotoya-Fuljor-Hurasagor River System with Bank protection.
T-5/812; Date: 21/01/2020
|
Exevutive Engineer, Bogura O&M Division, BWDB, Bogura. |
21/01/2020 |
12/03/2020
12:00 PM
|
Bogura |
| 7176 |
Temporary Camp Establishment and other various works in different locations of Cox’s Bazar District.
02-2019/2020
|
GSO-1, 10 Inf Div, Ramu Cantt, Coxs Bazar |
13/01/2020 |
09/02/2020
11:00 AM
|
Cox's Bazar |
| 7177 |
Supply, Construction, Installation, Testing and Commissioning of 33 KV Line from Panchagar to Tetulia on turnkey basis.
27.29.0000.015.07.081.20-279
|
Project Director Extension & Renovation Project of Distribution Line & Sub-Station of Rangpur Division, NESCO Ltd., Rangpur. |
21/01/2020 |
09/03/2020
10:00 AM
|
Rajshahi |
| 7178 |
Supply, Installation, Testing & Commissioning of 33/11KV Indoor Substation (10MVA EACH) on Turn-key Basis.
27.12.2637.138.07.023.20.706
|
Project Director,1.5 Million Consumer Connection Through Rural Electrification Expansion |
16/01/2020 |
10/02/2020
12:00 PM
|
Dhaka |
| 7179 |
Upgradation of existing fire fighting system with mordern type of wet riser system of bangladesh Bank, Head Office, Dhaka.
CSD-2(MES): 15/1/2020-03
|
Common Services Department-2, Bangladesh Bank, Head office, Dhaka |
09/01/2020 |
12/02/2020
02:30 PM
|
Dhaka |
| 7180 |
a. Improvement and Widening of Road by BC/RCC From Gazipur Women College to Esali Bridge Via South Chayabithi Bangalgach and Nilerpara.b. Construction of RCC Drain and Footpath From Gazipur Women College to Esali Bridge Via South Chayabithi Bangalgach and Nilerpara.
GCC/NB/Proku/DPP-WRDF/2019/4911
|
Widening of main connecting road in various zone including construction drain & footpath at Gazipur city corporation. |
19/01/2020 |
05/02/2020
02:00 PM
|
Gazipur |