| 8691 |
Improvement of road by RCC staring from Mymenshing club to Anjuman Eidgah pond via DC Banglo (Ch.0.00-542m.)
Improvement of road by RCC staring from Bolaspur Akmal house to Nurul Islam house via Kamrul house. (Ch.OO-lOOm.)
07/2017-2018
|
Executive Engineer, Mymensingh Pourashava. |
10/06/2018 |
05/07/2018
01:00 PM
|
Mymensingh |
| 8692 |
Construction of RCC Drain along the Road Side of Jalilpur Pass Matha to Kopotakni River Via Nowdagram Babu Bazar.Ch.00m to 1390.00m.
22.00.0000.037.14.025.18-83 & Tender No-02/2017-2018 Date:11-06-2018
|
Project Director, Improvement of Drainage and Road Light System in Moheshpur Poura area to combat the effects of climate change Moheshpur Pourashava Jhenidah. |
19/04/2018 |
03/07/2018
01:00 PM
|
Jhenaidah |
| 8693 |
Improvement of road & Kitchen Market
Bo:Pou/ Farid/ Eng/ 2010/ 316 (Part-2) / 144
|
Mayor, Boalmari Pourashava |
05/06/2018 |
28/06/2018
01:00 PM
|
Faridpur |
| 8694 |
Construction of Boundary Wall inShreehatta EZ, Upazilla- MoulvibazarSadar, District: Moulvibazar
03.777.000.00.00.054.2018
|
General Manager (Planning & Development), Bangladesh Economic Zones Authority. |
03/06/2018 |
09/07/2018
02:00 PM
|
Dhaka |
| 8695 |
Refurbishment of HGPI Spares of GT-2 for Bhola 225 MW CCPP, BPDB, Borhanuddin, Bhola, Bangladesh.
27.11.0000 .304. 18. 417.18
|
Bangladesh Power Development Board (BPDB) |
07/06/2018 |
26/07/2018
11:00 AM
|
Dhaka |
| 8696 |
Construction of Permanent Jetty, Steel Pontoon, Gangway, Guide wall, River Protection, Dredging, Internal Road etc. (Part-i and Part-ii) of Shahjalal Fertilizer Project at Kushiara River, Fenchugonj, Sylhet.
36.091.014.05.25-1.1662.2018/
|
Project Director, Shahjalal Fertilizer Project |
03/06/2018 |
16/07/2018
11:30 AM
|
Sylhet |
| 8697 |
Construction of Permanent Jetty, Steel Pontoon, Gangway, Guide wall, River Protection, Dredging, Internal Road etc. (Part-i and Part-ii) of Shahjalal Fertilizer Project at Kushiara River, Fenchugonj, Sylhet.
-36.091.014.05.25-1.1662.2018/
|
Project Director, Shahjalal Fertilizer Project |
03/06/2018 |
11/07/2018
11:00 AM
|
Sylhet |
| 8698 |
(i) Construction of RCC Drain from Nowapara Bowalmari canal to Mosorhaty Rail culvert via Model college at Ch.1380-3735.00m. with 400m link Drain.
NOA/Engg/36/2015-16/610(100)
|
Nowapara Pourashava, Jessore |
18/06/2018 |
17/07/2018
01:00 PM
|
Jashore |
| 8699 |
Procurement of Specialist Service for Major Inspection along with Turbine & Compressor Casing Replacement at Rangpur 20 MW Gas Turbine Power Station, BPDB, Rangpur, Bangladesh.
WR-06 (FY: 2017-2018) & 27.11.0000.304.18.416.18
|
Bangladesh Power Development Board (BPDB) |
31/05/2018 |
17/07/2018
11:00 AM
|
Dhaka |
| 8700 |
03.345.018.00.00.1148.2017-523
|
Cumilla Export Processing Zone |
24/05/2018 |
28/06/2018
12:00 PM
|
Cumilla |