CONSTRUCTION OF 5 PUBLIC TOILETS, 14 COMMUNITY LATRINES, 4.45 KM PRIMARY DRAINS, 1 SLUDGE TREATMENT PLANT, 1 SOLID WASTE COMPOSTING SYSTEM, 14 COMMUNAL BINS & 1 SOLID WASTE SORTING SHED ("THE WORKS") UNDER ''URBAN WATER SUPPLY AND SANITATION IN 23 POURASAVAS PROJECT''
Memo No : 46.03.7500.061.19-505
|
EXECUTIVE ENGINEER, DPHE, NOAKHALI DIVISION, NOAKHALI |
13/10/2019 |
18/11/2019
12:00 PM
|
Noakhali |
| 7342 |
18.14.0158.412.07.110.19
|
Chief Engineer (Mechanical & Electrical) |
|
20/11/2019
11:30 AM
|
Bagerhat |
| 7343 |
"i) DIFFERENT ROAD CONSTRUCTION /REPAIR OF ERL TANK FARM [RCC WORK 1) ON EXISTING HBB ROAD TO THE SOUTH OF TANK ‘A’-`B’-`C’ AND TO THE EAST OF TANK `C’-`D’ & 2) ON EXISTING SOIL ROAD TO THE SOUTH OF TANK T-44 &T-45]. ERL. Ref. No. ER/Civil-25/2018-2019(Retender)
ii) CONSTRUCTION OF RCC DYKE BY REPLACING EXISTING EARTHEN DYKE
,CC WORK INSIDE DYKE ,DEVELOPMENT OF SURROUNDING AREA OF- TANK T16-12- 04-13-11-7-5-18-02-14-03-15. ERL. Ref No. ER/Civil-26/2018-2019 (Retender)
"
a) ER/Civil-04/2019-2020
|
Bangladesh Petroleum Corporation (BPC) |
03/10/2019 |
21/10/2019
02:45 AM
|
Chattogram |
| 7344 |
18.16.0000.373.02.076.19/COMC– 14/10/19,
|
Chairman, Bangladesh Agricultural Development Corporation (BADC), Dhaka, Bangladesh. |
|
31/10/2019
11:00 AM
|
Dhaka |
| 7345 |
18.16.0000.373.02.077.19/COMC– 10/10/19
|
Chairman, Bangladesh Agricultural Development Corporation (BADC), Dhaka, Bangladesh. |
|
27/10/2019
11:00 AM
|
Dhaka |
| 7346 |
a) Construction of 25m long PC Girder Bridge on Adampur-Adkanibazar Road via Kawargola bazar Road at Ch. 2750m under KamalgonjUpazila, District: Moulvibazar ID no: 658563003
b) Construction of 46m long RCC Girder Bridge on Holdigul-Kalarbazar road to Bokshipur road at Ch. 250m under RajnagarUpazila, District: Moulvibazar ID no: 658805030.
c) Construction of 20m long RCC Girder Bridge on Atuaborail-Kumarshail Road at Ch. 3500m under BarlekhaUpazila, District: Moulvibazar ID no: 658144010
46.02.5800.000.001.07.19-2823
|
The Executive Engineer |
10/10/2019 |
12/11/2019
02:00 PM
|
Moulvibazar |
| 7347 |
Construction of single storied union bhumi office with 2-storied foundation in/c internal sanitary & internal electrification works under "construction of upazila and union bhumi office (6th Phase)" project, one at dighi union, at sadar upazila, in Manikganj district. Financial year 2019-2020.
25.36.5600.540-05/2019-20
|
Executive Engineer, Manikganj PWD division, Manikganj. |
06/10/2019 |
22/10/2019
11:30 AM
|
Manikganj |
| 7348 |
Construction of Seed Certification Office complex 2-storied building with 3-storied foundation including Civil sanitaryelectrification and ancillaries works under the Scheme of Strengthening of Seed Certification Agencies Activities one at Nilphamari. FY-2019-2020.
12.80.0000.084.14.152.15-346 Date- 18/12/2018, 1868 Date-14.10.19
|
Executive Engineer, Nilphamari PWD Division, Nilphamari. |
18/12/2018 |
12/11/2019
05:00 PM
|
Nilphamari |
| 7349 |
Management of Operation, Development, Maintenance and Related Works for Production of Minimum 8.850 Million Metric Tons of stones in 6 (six) years period from Maddhapara Granite Mine.
28.17.0000.200.09.001.19-103
|
Maddhapara Granite Mining Company Limited (MGMCL) |
07/10/2019 |
28/11/2019
12:15 PM
|
Dinajpur |
| 7350 |
External Electrification in/c Electrical Substation Equipment X-former HT switch gear LT switch gear PFI HT Cable LT Cable Generator Over-Head Line Compound and Garden light Air Cooler Fire Protection System PABX System Pump Motor Dehumidifier and Solar Panel Conference System and Lightening Arrester under the Project of vertical Extension of Hospital Building at M Abdur Rahim Medical College Hospital Dinajpur.